Author Question: With regards to constructing a service blueprint, the time required to perform one activity at one ... (Read 99 times)

CQXA

  • Hero Member
  • *****
  • Posts: 546
With regards to constructing a service blueprint, the time required to perform one activity at one station is called:
 A) process time.
  B) activity time.
  C) maximum output per hour.
  D) operation time.
  E) bottleneck time.

Question 2

Profit would be an example of a(n) __________.
 A) mission statement
  B) strategy
  C) goal or objective
  D) strength
  E) operating philosophy



nhea

  • Sr. Member
  • ****
  • Posts: 305
Answer to Question 1

B

Answer to Question 2

C



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

Barbituric acid, the base material of barbiturates, was first synthesized in 1863 by Adolph von Bayer. His company later went on to synthesize aspirin for the first time, and Bayer aspirin is still a popular brand today.

Did you know?

Though Candida and Aspergillus species are the most common fungal pathogens causing invasive fungal disease in the immunocompromised, infections due to previously uncommon hyaline and dematiaceous filamentous fungi are occurring more often today. Rare fungal infections, once accurately diagnosed, may require surgical debridement, immunotherapy, and newer antifungals used singly or in combination with older antifungals, on a case-by-case basis.

Did you know?

People with high total cholesterol have about two times the risk for heart disease as people with ideal levels.

Did you know?

Long-term mental and physical effects from substance abuse include: paranoia, psychosis, immune deficiencies, and organ damage.

Did you know?

Cucumber slices relieve headaches by tightening blood vessels, reducing blood flow to the area, and relieving pressure.

For a complete list of videos, visit our video library