A PERT diagram is useful when:
 
  A) activities can be done in parallel rather than sequence.
  B) there is no slack time available.
  C) the project team needs to know which activities should be done at which point in time.
  D) activities do not have any precedent activities.

Question 2

Within one relation, two rows can be identical.
 
  Indicate whether the statement is true or false



debra928

  • Sr. Member
  • ****
  • Posts: 342
Answer to Question 1

A

Answer to Question 2

FALSE



Related Topics

Need homework help now?

Ask unlimited questions for free

Ask a Question
 

Did you know?

When blood is exposed to air, it clots. Heparin allows the blood to come in direct contact with air without clotting.

Did you know?

Nearly all drugs pass into human breast milk. How often a drug is taken influences the amount of drug that will pass into the milk. Medications taken 30 to 60 minutes before breastfeeding are likely to be at peak blood levels when the baby is nursing.

Did you know?

Signs and symptoms of a drug overdose include losing consciousness, fever or sweating, breathing problems, abnormal pulse, and changes in skin color.

Did you know?

Human stomach acid is strong enough to dissolve small pieces of metal such as razor blades or staples.

Did you know?

Many people have small pouches in their colons that bulge outward through weak spots. Each pouch is called a diverticulum. About 10% of Americans older than age 40 years have diverticulosis, which, when the pouches become infected or inflamed, is called diverticulitis. The main cause of diverticular disease is a low-fiber diet.

For a complete list of videos, visit our video library